Inspection in 20 seconds, not 25 minutes
Valeo cut inspection time by 98.7% with a 3D printed go/no-go check fixture, while maintaining CMM-level accuracy. Faster checks, lower costs, and consistent quality, right on the shop floor.
Cut inspection time by up to 75% and tooling costs in half
Eaton replaced traditional gear inspection tooling with 3D printed check fixtures, reducing lead times by 60% while improving consistency on the shop floor. Faster validation and lower inspection costs.
Reduce setup from minutes to seconds
Christopher Tool used 3D printed CMM fixtures to speed up inspection by 90%, improve repeatability, and keep measurements consistent across complex parts.
Cut fixture costs by up to 93% and lead times by 80%
Senga Engineering replaced machined inspection fixtures with 3D printed alternatives, speeding up CMM setup while improving repeatability.
Valeo cut inspection time by 98.7% with a 3D printed go/no-go check fixture, while maintaining CMM-level accuracy. Faster checks, lower costs, and consistent quality, right on the shop floor.
Eaton replaced traditional gear inspection tooling with 3D printed check fixtures, reducing lead times by 60% while improving consistency on the shop floor. Faster validation and lower inspection costs.
Christopher Tool used 3D printed CMM fixtures to speed up inspection by 90%, improve repeatability, and keep measurements consistent across complex parts.
Senga Engineering replaced machined inspection fixtures with 3D printed alternatives, speeding up CMM setup while improving repeatability.